---
title: "Arada W Residences at Dubai Harbour, Dubai Marina · Realton"
description: "Arada W Residences by Arada in Dubai Marina, Dubai. 1 to 5 bedrooms from AED 3,911,000. Handover Q4 2027. Payment plan 60/40."
canonical: https://realton.ai/en/projects/arada-w-residences-at-dubai-harbour
locale: en
---

# Arada W Residences at Dubai Harbour

Arada · Dubai Marina, Dubai

- **Price from**: AED 3,911,000
- **Bedrooms**: 1 to 5 bedrooms
- **Payment plan**: 60/40
- **Handover**: Q4 2027
- **Stage**: Off-plan
- Starting price from the developer's list of 10 November 2026
- Last checked 20 November 2026

## About the project

At Dubai Harbour, in the Dubai Marina area, ARADA is building Arada W Residences, a 50-storey tower of 494 apartments.

Apartments have one to five bedrooms, starting at about 1,023 sq ft for one bedroom, 1,577 sq ft for two, 1,933 sq ft for three, 3,383 sq ft for four and 5,041 sq ft for five. Dubai Marina Mall is about 2 km away, Business Bay about 16 km, Burj Khalifa about 18 km and Al Maktoum International Airport (DWC) about 23 km.

## Homes and starting prices

| Type | Size from | Price from |
|---|---|---|
| 1 bedroom | 1,023 sq ft | AED 3,911,000 |
| 2 bedrooms | 1,577 sq ft | AED 5,845,000 |
| 3 bedrooms | 1,933 sq ft | AED 7,144,000 |
| 4 bedrooms | 3,598 sq ft | AED 17,007,000 |
| 5 bedrooms | 5,041 sq ft | AED 26,733,000 |

One starting price for each kind of home. The homes on sale today are inside Realton, for agents.

## Payment plan

Down payment 10% · During construction 30% · On handover 60%

- Down payment: 10%, On booking
- Instalment 1: 10%, 5 months after booking
- Instalment 2: 5%, 10 months after booking
- Instalment 3: 5%, 15 months after booking
- Instalment 4: 5%, 20 months after booking
- Instalment 5: 5%, 25 months after booking
- On handover: 60%, On handover

Plus 4% DLD registration on booking

## Amenities

Near the beach

## Dubai Marina

Dubai Marina is a waterfront district on the Dubai coast, built around a man-made marina, about 1.7 km from Dubai Harbour and about 18 km from Burj Khalifa; Dubai Marina Mall is less than 1 km away.

About 20 projects are on sale here, from Emaar Properties, Al Habtoor Group, Five Holdings, LIV Development, London Gate and others.

More than 10 are off-plan and 6 are ready to move into.

## Map and surroundings

- Mina Seyahi: 0.5 km
- Emirates Hospital: 0.7 km
- Marina Towers: 0.9 km
- Dubai Media City: 0.9 km
- Dubai Marina: 1.2 km
- Sobha Realty: 1.4 km
- Jumeirah Beach Residence 1: 1.4 km
- Palm Jumeirah: 1.5 km
- Al Fardan Exchange: 1.5 km
- Dubai Marina Mall: 1.7 km
- Dubai Marina Mall: 1.7 km
- JBR / The Beach: 1.7 km
- Jumeirah Lakes Towers Park: 1.9 km
- Welcare Hospital: 2.1 km
- ICCA Dubai: 2.2 km

## Questions buyers ask

### When are the keys handed over?

Handover is planned for Q4 2027.

### How is the payment split?

60% is paid while the building goes up, and 40% when the keys are handed over.

### What is paid on top of the price?

The Dubai Land Department's registration fee, 4% of the price.

### How big is the building?

The building has 50 floors and 494 homes.

### Is the project registered?

Yes. It is on the Dubai Land Department's register under number 3317, and buyers' payments go into an escrow account at National Bank Of Ras Al- Khaimah (P.S.C).

## More on this project inside Realton

A free account opens the rest of this project:

- The homes on sale, from the developer's own list (The list of 10 November 2026)
- 1 file from the developer: Price list
- The developer's sales manager for this project

[Start free](https://realton.ai/en/signup?next=%2Fen%2Fapp%2Fcatalog%2Fwp%253Acmpugisx602x8qp07vh58qne3)

## More projects in Dubai Marina

- [Marina Shores](https://realton.ai/en/projects/marina-shores): Dubai Marina, Dubai · Emaar Properties · from AED 4,467,888 · 2 to 3 bedrooms · Handover Q2 2027
- [LIV Marina](https://realton.ai/en/projects/liv-marina): Dubai Marina, Dubai · LIV Development · from AED 4,599,548 · 2 to 4 bedrooms · Ready
- [Marina Arcade](https://realton.ai/en/projects/marina-arcade): Dubai Marina, Dubai · Mada’in Properties · from AED 8,600,000 · 3 bedrooms · Ready
- [LIV Waterside](https://realton.ai/en/projects/liv-waterside): Dubai Marina, Dubai · LIV Development · from AED 39,499,548 · 4 bedrooms · Ready
- [LIV Lux](https://realton.ai/en/projects/liv-lux): Dubai Marina, Dubai · LIV Development · from AED 4,499,548 · 2 to 5 bedrooms · Handover Q4 2026
- [Franck Muller Aeternitas by London Gate at Dubai Marina, Dubai](https://realton.ai/en/projects/franck-muller-aeternitas-by-london-gate-at-dubai-marina-dubai): Dubai Marina, Dubai · London Gate · from AED 9,700,000 · 4 bedrooms · Handover Q4 2027

## More projects by Arada

- [Masaar 3 Layan](https://realton.ai/en/projects/masaar-3-layan): Al Waha, Sharjah · Arada · from AED 3,065,000 · 3 to 5 bedrooms · Handover Q3 2029
- [Masaar 3 Dalia](https://realton.ai/en/projects/masaar-3-dalia): Al Waha, Sharjah · Arada · from AED 2,665,000 · 2 to 4 bedrooms · Handover Q4 2029
- [Inaura Hotels & Residences at Downtown, Dubai](https://realton.ai/en/projects/inaura-hotels-and-residences-at-downtown-dubai): Downtown, Dubai · Arada · from AED 3,625,000 · 1 to 6 bedrooms · Handover Q2 2030
- [Masaar 3 Sedra by Arada at Al Waha, Sharjah](https://realton.ai/en/projects/masaar-3-sedra-by-arada-at-al-waha-sharjah): Al Waha, Sharjah · Arada · from AED 3,045,000 · 3 to 5 bedrooms · Handover Q4 2028
- [Arada The Gate 5 at Aljada, Muwaileh Commercial, Sharjah](https://realton.ai/en/projects/arada-the-gate-5-at-aljada-muwaileh-commercial-sharjah): Aljada, Sharjah · Arada · from AED 1,115,000 · 1 to 3 bedrooms · Handover Q2 2028
- [Masaar 3 Laura at Al Waha, Sharjah](https://realton.ai/en/projects/masaar-3-laura-at-al-waha-sharjah): Al Waha, Sharjah · Arada · from AED 2,675,000 · 3 to 5 bedrooms · Handover Q4 2028
