---
title: "Bam Eskan 311 Boulevard at JVC, Dubai · Realton"
description: "Bam Eskan 311 Boulevard by BAMX Development in JVC, Dubai. Studios to 3 bedrooms from AED 1,026,028. Handover Q3 2027. Payment plan 65/35."
canonical: https://realton.ai/en/projects/bam-eskan-311-boulevard-at-jvc-dubai
locale: en
---

# Bam Eskan 311 Boulevard at JVC, Dubai

BAMX Development · JVC, Dubai

- **Price from**: AED 1,026,028
- **Bedrooms**: Studios to 3 bedrooms
- **Payment plan**: 65/35
- **Handover**: Q3 2027
- **Stage**: Off-plan
- Starting price from the developer's list of 19 October 2026
- Last checked 20 November 2026

## About the project

Bam Eskan Development is building Bam Eskan 311 Boulevard in JVC, Dubai: 19 floors and 399 apartments, from studios to three bedrooms.

Studios start at 479 sq ft, one-bedroom apartments at 807 sq ft, two-bedroom at 1,005 sq ft and three-bedroom at 1,707 sq ft. Circle Mall is about 1 km away and Dubai Marina about 7 km. Burj Khalifa is about 17 km off, and Al Maktoum International Airport (DWC) about 20 km.

## Homes and starting prices

| Type | Size from | Price from |
|---|---|---|
| Studio | 479 sq ft | AED 1,026,028 |
| 1 bedroom | 807 sq ft | AED 1,430,748 |
| 2 bedrooms | 1,005 sq ft | AED 2,127,457 |
| 3 bedrooms | 1,707 sq ft | AED 2,820,390 |

One starting price for each kind of home. The homes on sale today are inside Realton, for agents.

## Payment plan

### Standard plan

Down payment 20% · During construction 30% · On handover 50%

- Down payment 1: 5%, On booking
- Down payment 2: 5%, 3 months after booking
- Down payment 3: 10%, 6 months after booking
- Instalment 1: 2.5%, At 40% construction
- Instalment 2: 2.5%, At 45% construction
- Instalment 3: 2.5%, At 50% construction
- Instalment 4: 2.5%, At 55% construction
- Instalment 5: 2.5%, At 60% construction
- Instalment 6: 2.5%, At 65% construction
- Instalment 7: 2.5%, At 70% construction
- Instalment 8: 2.5%, At 75% construction
- Instalment 9: 2.5%, At 80% construction
- Instalment 10: 2.5%, At 85% construction
- Instalment 11: 2.5%, At 90% construction
- Instalment 12: 2.5%, At 95% construction
- …

### Post-handover plan (Price 5% higher)

Down payment 20% · During construction 30% · On handover 20% · After handover 30%

- Down payment 1: 5%, On booking
- Down payment 2: 5%, 3 months after booking
- Down payment 3: 10%, 6 months after booking
- Instalment 1: 2.5%, At 40% construction
- Instalment 2: 2.5%, At 45% construction
- Instalment 3: 2.5%, At 50% construction
- Instalment 4: 2.5%, At 55% construction
- Instalment 5: 2.5%, At 60% construction
- Instalment 6: 2.5%, At 65% construction
- Instalment 7: 2.5%, At 70% construction
- Instalment 8: 2.5%, At 75% construction
- Instalment 9: 2.5%, At 80% construction
- Instalment 10: 2.5%, At 85% construction
- Instalment 11: 2.5%, At 90% construction
- Instalment 12: 2.5%, At 95% construction
- …

Plus 4% DLD registration on booking

## JVC

JVC is a residential district in Dubai, away from the coast, about 7 km from Dubai Marina and about 17 km from Burj Khalifa, with Circle Mall about 1.6 km away.

About 120 projects are on sale here, from developers such as Danube Properties, Fakhruddin Properties, Condor Development and AYS Developers.

More than 90 of them are off-plan, 6 are under construction and more than 10 are ready to move into.

## Map and surroundings

- Qesad: 0.3 km
- Henna Park: 0.4 km
- Yas Park: 0.5 km
- Khansoor Park: 0.5 km
- Eisbej: 0.6 km
- Thamam Park: 0.7 km
- 2nd of December: 0.7 km
- Halool: 0.8 km
- Sider Park: 0.9 km
- Shooa: 0.9 km
- Markh Park: 1 km
- Sabar Park: 1 km
- Halfa: 1.1 km
- Sgal Park: 1.1 km
- Farfar: 1.2 km

## Questions buyers ask

### When are the keys handed over?

Handover is planned for Q3 2027.

### How is the payment split?

65% is paid while the building goes up, and 35% when the keys are handed over.

### What is paid on top of the price?

The Dubai Land Department's registration fee, 4% of the price.

### How big is the building?

The building has 19 floors and 399 homes.

### Is the project registered?

Yes. It is on the Dubai Land Department's register under number 3320, and buyers' payments go into an escrow account at Abu Dhabi Commercial Bank.

## More on this project inside Realton

A free account opens the rest of this project:

- The homes on sale, from the developer's own list (The list of 19 October 2026)
- The developer's sales manager for this project

[Start free](https://realton.ai/en/signup?next=%2Fen%2Fapp%2Fcatalog%2Fwp%253Acmpugief102leqp074va7j022)

## More projects in JVC

- [Valore by Grid](https://realton.ai/en/projects/valore-by-grid): JVC, Dubai · Grid Properties · from AED 699,888 · Studios to 3 bedrooms · Handover Q3 2027
- [Binghatti Amber](https://realton.ai/en/projects/binghatti-amber): JVC, Dubai · Binghatti Developers · from AED 1,700,000 · 2 bedrooms · Ready
- [Q Gardens Lofts](https://realton.ai/en/projects/q-gardens-lofts): JVC, Dubai · AYS Developers · from AED 2,798,000 · 2 to 4 bedrooms
- [Mass Residence](https://realton.ai/en/projects/mass-residence): JVC, Dubai · Jaiedco Development · from AED 2,329,268 · 2 bedrooms · Ready
- [Concept 7](https://realton.ai/en/projects/concept-7): JVC, Dubai · Condor Development · from AED 1,437,591 · 1 bedroom · Ready
- [Dusit Princess Rijas](https://realton.ai/en/projects/dusit-princess-rijas): JVC, Dubai · Rijas Developers · from AED 3,190,000 · Studios · Handover Q1 2027

## More projects by BAMX Development

- [BAMX X 11 at Dubai South, Dubai](https://realton.ai/en/projects/bamx-x-11-at-dubai-south-dubai): Dubai South, Dubai · BAMX Development · from AED 932,000 · 1 to 3 bedrooms · Handover Q4 2027
