---
title: "Me Do Re 2 at JLT, Dubai · Realton"
description: "Me Do Re 2 by Me Do Re Properties in JLT, Dubai. Studios to 3 bedrooms from AED 995,000. Handover Q4 2025. Payment plan 20/80."
canonical: https://realton.ai/en/projects/me-do-re-2-at-jlt-dubai
locale: en
---

# Me Do Re 2 at JLT, Dubai

Me Do Re Properties · JLT, Dubai

- **Price from**: AED 995,000
- **Bedrooms**: Studios to 3 bedrooms
- **Payment plan**: 20/80
- **Handover**: Q4 2025
- **Stage**: Off-plan
- Last checked 20 November 2026

## About the project

In JLT, Dubai, the developer Me Do Re is building Me Do Re 2, a 46-floor tower of 407 homes.

The apartments range from studios to three bedrooms. Dubai Marina Mall is under a kilometre away and Dubai Harbour about 3 km. Burj Khalifa is about 19 km off, and Al Maktoum International Airport (DWC) about 20 km.

## Payment plan

During construction 20% · On handover 80%

- During construction: 20%, During construction
- On handover: 80%, On handover

Plus 4% DLD registration on booking

## Amenities

Near the metro

## JLT

JLT is a district of towers set around artificial lakes next to Dubai Marina, about 1.8 km from Dubai Marina Mall, 4 km from Dubai Harbour and 20 km from Burj Khalifa.

There are 9 projects on sale here, from developers such as Ellington, MAG Property Development, Danube Properties, Saba Properties and Sobha Realty.

Of these, 8 are off-plan and 1 is under construction.

## Map and surroundings

- Jumeirah Lakes Towers Park: 0.4 km
- DMCC: 0.5 km
- Dubai Marina Mall: 0.6 km
- Jumeirah Lakes Towers: 0.6 km
- Dubai Marina Mall: 0.7 km
- Sobha Realty: 1 km
- Jumeirah Beach Residence 1: 1.1 km
- Dubai Marina: 1.1 km
- JBR / The Beach: 1.2 km
- Jumeirah Beach Residence 2: 1.2 km
- Emirates International School - Meadows: 1.4 km
- Emirates Hospital: 1.6 km
- Marina Towers: 1.8 km
- Bluewaters Wharf Retail: 2.1 km
- National Paints: 2.2 km

## Questions buyers ask

### When are the keys handed over?

Handover is planned for Q4 2025.

### How is the payment split?

20% is paid while the building goes up, and 80% when the keys are handed over.

### What is paid on top of the price?

The Dubai Land Department's registration fee, 4% of the price.

### How big is the building?

The building has 46 floors and 407 homes.

### Is the project registered?

Yes. It is on the Dubai Land Department's register under number 3056, and buyers' payments go into an escrow account at Commercial Bank Of Dubai(Psc).

## More on this project inside Realton

Realton is the catalog real estate agents work from. Open a free account to work with this project.


[Start free](https://realton.ai/en/signup?next=%2Fen%2Fapp%2Fcatalog%2Fwp%253Acmpugiuvw02y9qp076j3o4w43)

## More projects in JLT

- [Ellington Mercer House at Uptown Dubai, JLT](https://realton.ai/en/projects/ellington-mercer-house-at-uptown-dubai-jlt): JLT, Dubai · Ellington Properties · from AED 4,640,828 · Studios to 4 bedrooms
- [Eltiera Views at JLT, Dubai](https://realton.ai/en/projects/eltiera-views-at-jlt-dubai): JLT, Dubai · Ellington Properties · from AED 2,116,828 · 1 to 3 bedrooms · Handover Q4 2029
- [ME DO RE Business at JLT, Dubai](https://realton.ai/en/projects/me-do-re-business-at-jlt-dubai): JLT, Dubai · Me Do Re Properties · from AED 3,979,000 · Handover Q3 2029
- [MAG MBL Signature at JLT, Dubai](https://realton.ai/en/projects/mag-mbl-signature-at-jlt-dubai): JLT, Dubai · MAG Group · from AED 1,381,612 · Studios to 2 bedrooms · Handover Q4 2026
- [Danube Viewz 2 at JLT, Dubai](https://realton.ai/en/projects/danube-viewz-2-at-jlt-dubai): JLT, Dubai · Danube Properties · from AED 1,967,784 · Studios to 4 bedrooms · Handover Q2 2026
- [Marriott Residences at JLT, Dubai](https://realton.ai/en/projects/marriott-residences-at-jlt-dubai): JLT, Dubai · SABA Properties · from AED 2,813,160 · 1 to 3 bedrooms · Handover Q2 2027

## More projects by Me Do Re Properties

- [ME DO RE Business at JLT, Dubai](https://realton.ai/en/projects/me-do-re-business-at-jlt-dubai): JLT, Dubai · Me Do Re Properties · from AED 3,979,000 · Handover Q3 2029
