---
title: "South Lofts at Dubai Industrial City, Dubai · Realton"
description: "South Lofts by Premier Choice in Industrial City, Dubai. Studios from AED 499,000. Handover Q2 2028. Payment plan 60/40."
canonical: https://realton.ai/en/projects/south-lofts-at-dubai-industrial-city-dubai
locale: en
---

# South Lofts at Dubai Industrial City, Dubai

Premier Choice · Industrial City, Dubai

- **Price from**: AED 499,000
- **Bedrooms**: Studios
- **Payment plan**: 60/40
- **Handover**: Q2 2028
- **Stage**: Off-plan
- Starting price from the developer's list of 20 November 2026
- Last checked 20 November 2026

## About the project

Premier Choice Developer is building South Lofts in Industrial City, Dubai: a nine-storey building with 149 homes.

The Outlet Village is about 6 km away and Al Maktoum International Airport (DWC) about 13 km; Dubai Marina is about 25 km off.

## Homes and starting prices

| Type | Size from | Price from |
|---|---|---|
| Studio | 341 sq ft | AED 499,000 |
| 1 bedroom | 636 sq ft | AED 799,000 |

One starting price for each kind of home. The homes on sale today are inside Realton, for agents.

## Payment plan

### Standard plan

Down payment 20% · During construction 40% · On handover 40%

- Down payment: 20%, On booking
- During construction: 40%, During construction
- On handover: 40%, On handover

### Post-handover plan

Down payment 20% · During construction 30% · On handover 10% · After handover 40%

- Down payment: 20%, On booking
- During construction: 30%, During construction
- On handover: 10%, On handover
- After handover: 40%, After handover

Plus 4% DLD registration on booking

## Amenities

Cinema

## Industrial City

Industrial City lies in the south of Dubai, about 11 km from Al Maktoum International Airport and 24 km from Dubai Marina, with The Outlet Village about 5.5 km away.

More than 10 projects are on sale here, from developers such as GFS Developments, Zoya Developments, Al Mizan Development, Premier Choice Developer and Dugasta Properties.

Most of them are off-plan, and 1 is ready to move into.

## Map and surroundings

- Forest Park: 3.2 km
- Waterfall Park: 3.3 km
- Rainbow Park: 3.4 km
- Oasis Park: 3.4 km
- The Outlet Village: 5.5 km
- Shifa International Hospitals DWC: 9.2 km
- Badrah Pavilion: 9.2 km
- Al Maktoum International Airport (DWC): 12.5 km
- Life Pharmacy: 13.1 km
- Jubilee Park: 14.9 km
- Expo Park: 14.9 km

## Questions buyers ask

### When are the keys handed over?

Handover is planned for Q2 2028.

### How is the payment split?

60% is paid while the building goes up, and 40% when the keys are handed over.

### What is paid on top of the price?

The Dubai Land Department's registration fee, 4% of the price.

### How big is the building?

The building has 9 floors and 149 homes.

### Is the project registered?

Yes. It is on the Dubai Land Department's register under number 4350, and buyers' payments go into an escrow account at Emirates Nbd Bank  (P.J.S.C).

## More on this project inside Realton

A free account opens the rest of this project:

- The homes on sale, from the developer's own list (The list of 20 November 2026)
- 1 file from the developer: Price list

[Start free](https://realton.ai/en/signup?next=%2Fen%2Fapp%2Fcatalog%2Fwp%253Acmpughayc01tkqp07rajimnqj)

## More projects in Industrial City

- [Coventry Curve 2](https://realton.ai/en/projects/coventry-curve-2): Industrial City, Dubai · GFS Developments · from AED 521,787 · Studios to 1 bedroom · Handover Q2 2029
- [Mirari](https://realton.ai/en/projects/mirari): Industrial City, Dubai · Zoya Developments · from AED 725,000 · Studios to 2 bedrooms · Handover Q4 2028
- [Terva Homes at Dubai Industrial City, Dubai](https://realton.ai/en/projects/terva-homes-at-dubai-industrial-city-dubai): Industrial City, Dubai · Al Mizan Development · from AED 2,542,100 · 3 to 4 bedrooms · Handover Q2 2027
- [Siana by Zoya at Dubai Industrial City, Dubai](https://realton.ai/en/projects/siana-by-zoya-at-dubai-industrial-city-dubai): Industrial City, Dubai · Zoya Developments · from AED 785,000 · Studios to 1 bedroom · Handover Q4 2027
- [Elanora By Zoya at Dubai Industrial City, Dubai](https://realton.ai/en/projects/elanora-by-zoya-at-dubai-industrial-city-dubai): Industrial City, Dubai · Zoya Developments · from AED 710,000 · Studios to 2 bedrooms · Handover Q3 2027
- [Al Haseen Residences 6 at Dubai Industrial City, Dubai](https://realton.ai/en/projects/al-haseen-residences-6-at-dubai-industrial-city-dubai): Industrial City, Dubai · Dugasta · from AED 809,306 · Studios to 2 bedrooms · Handover Q4 2027

## More projects by Premier Choice

- [Gateway by Premier Choice at JVC, Dubai](https://realton.ai/en/projects/gateway-by-premier-choice-at-jvc-dubai): JVC, Dubai · Premier Choice · from AED 1,164,000 · 1 to 3 bedrooms · Handover Q4 2025
