Coventry Curve 2
GFS Developments · Industrial City, Dubai
About the project
Studios and one-bedroom apartments fill Coventry Curve 2, a GFS Developments project in Industrial City, Dubai. Studios start at about 337 sq ft and one-bedroom apartments at about 680 sq ft. Homes have built-in kitchens, and each comes with a Siemens washing machine, fridge and oven, smart-home controls and a smart lock. Pets are allowed. The building has lifts, a pool, a gym and a children's play area. The Outlet Village is about 5.5 km away, Al Maktoum International Airport (DWC) about 11 km and Dubai Marina about 24 km.
Homes and starting prices
| Type | Size from | Price from |
|---|---|---|
| Studio | 337 sq ft | AED 521,787 |
| 1 bedroom | 680 sq ft | AED 901,680 |
One starting price for each kind of home. The homes on sale today are inside Realton, for agents.
Payment plan
| Stage | Share | When | Amount |
|---|---|---|---|
| Down payment | 5% | On booking | AED 26,089 |
| Instalment 1 | 15% | 1 month after booking | AED 78,268 |
| Instalment 2 | 44% | During construction | AED 229,586 |
| After handover 1 | 1% | 1 month after handover | AED 5,218 |
| After handover 2 | 1% | 2 months after handover | AED 5,218 |
| After handover 3 | 1% | 3 months after handover | AED 5,218 |
| After handover 4 | 1% | 4 months after handover | AED 5,218 |
| After handover 5 | 1% | 5 months after handover | AED 5,218 |
| After handover 6 | 1% | 6 months after handover | AED 5,218 |
| After handover 7 | 1% | 7 months after handover | AED 5,218 |
| After handover 8 | 1% | 8 months after handover | AED 5,218 |
| After handover 9 | 1% | 9 months after handover | AED 5,218 |
| After handover 10 | 1% | 10 months after handover | AED 5,218 |
| After handover 11 | 1% | 11 months after handover | AED 5,218 |
| After handover 12 | 1% | 12 months after handover | AED 5,218 |
The 4% Dubai Land Department fee is paid separately and is not part of the plan.
Amenities
- Swimming pool
- Gym
- Built-in kitchen
- Children's play area
- Lifts
Industrial City
Industrial City lies in the south of Dubai, about 11 km from Al Maktoum International Airport and 24 km from Dubai Marina, with The Outlet Village about 5.5 km away.
More than 10 projects are on sale here, from developers such as GFS Developments, Zoya Developments, Al Mizan Development, Premier Choice Developer and Dugasta Properties.
Most of them are off-plan, and 1 is ready to move into.
Map and surroundings
- AirportAl Maktoum International Airport (DWC)11.3 km
- LandmarkBurj Khalifa42.2 km
- MarinaDubai Marina24.0 km
- MallThe Outlet Village5.5 km
- Park: Forest Park4.4 km
- Park: Waterfall Park4.6 km
- Park: Rainbow Park4.6 km
- Park: Oasis Park4.6 km
- Mall: The Outlet Village5.5 km
- Hospital: Shifa International Hospitals DWC7.8 km
- Mall: Badrah Pavilion8.3 km
- Airport: Al Maktoum International Airport (DWC)11.3 km
Distances are in a straight line.
Terms from the developer
The developer's own terms and details for this project.
- To reserve a home
- 5% of the price
- Developer's admin fee
- AED 3,000
- Resale before handover
- Allowed once 40% is paid
- Pets
- Allowed
- Smart home system
- Included
- Smart door lock
- Included
- Appliances
- Washing machine · Siemens; Fridge · Siemens; Oven · Siemens
Questions buyers ask
When are the keys handed over?
Handover is planned for Q2 2029.
How is the payment split?
20% is paid during construction, 44% at handover, and the last 36% after handover.
What does it take to reserve a home?
A home is reserved with 5% of its price.
What is paid on top of the price?
The Dubai Land Department's registration fee, 4% of the price, and the developer's admin fee of AED 3,000.
Are pets allowed?
Yes, pets are allowed.
Can a home be resold before handover?
Yes, with the developer's approval, once 40% of the price has been paid.
Do the homes have a smart home system?
Yes, the homes come with a smart home system.
For agents
More on this project inside Realton
A free account opens the rest of this project:
- The homes on sale, from the developer's own listThe list of 28 October 2026
- 2 files from the developerFloor plans and Price list
- The developer's sales manager for this project
All of it is in the Free plan.
More projects in Industrial City
Mirari
Industrial City, Dubai · Zoya Developmentsfrom AED 725,000Studios to 2 bedrooms · Handover Q4 2028
Terva Homes at Dubai Industrial City, Dubai
Industrial City, Dubai · Al Mizan Developmentfrom AED 2,542,1003 to 4 bedrooms · Handover Q2 2027
Siana by Zoya at Dubai Industrial City, Dubai
Industrial City, Dubai · Zoya Developmentsfrom AED 785,000Studios to 1 bedroom · Handover Q4 2027
South Lofts at Dubai Industrial City, Dubai
Industrial City, Dubai · Premier Choicefrom AED 799,000Studios · Handover Q2 2028
Elanora By Zoya at Dubai Industrial City, Dubai
Industrial City, Dubai · Zoya Developmentsfrom AED 710,000Studios to 2 bedrooms · Handover Q3 2027
Al Haseen Residences 6 at Dubai Industrial City, Dubai
Industrial City, Dubai · Dugastafrom AED 809,306Studios to 2 bedrooms · Handover Q4 2027
More projects by GFS Developments
Canterbury Waterfront
Al Zorah, Ajman · GFS Developmentsfrom AED 494,190Studios to 2 bedrooms · Handover Q1 2029
GFS Coventry Curves at Dubai South, Dubai
Dubai South, Dubai · GFS Developmentsfrom AED 519,250
GFS Coventry Centro at Industrial City, Dubai
Industrial City, Dubai · GFS Developmentsfrom AED 537,433Studios to 1 bedroom · Handover Q3 2028GFS Coventry Residence 2 at International City, Dubai
International City, Dubai · GFS Developmentsfrom AED 492,000Studios to 1 bedroom · Handover Q4 2027
GFS Coventry Residence at Industrial City, Dubai
Industrial City, Dubai · GFS Developmentsfrom AED 917,340Studios · Handover Q3 2027
GFS Coventry 2 at International City, Dubai
International City, Dubai · GFS Developmentsfrom AED 1,106,840Studios to 1 bedroom · Handover Q2 2028